The test is conducted by certified subcontractors, managed entirely by our team for a smooth process.
We provide a detailed report identifying air leaks and practical solutions to fix them. Re-testing services are available to confirm compliance once these measures have been put in place.
By identifying and sealing air leaks, buildings retain heat more effectively, lowering energy consumption and bills.
Yes, we handle all subcontractor coordination at no extra cost, ensuring seamless testing and certification. The cost you receive is the quote from the contractor; no additional amount is added on top.
Reports are delivered within 24 hours of testing.
Airtightness testing ensures compliance with Part L or PAS 2035, but which method is right for your project?
• Blower Door Testing: Pinpoints air leaks for effective fixes.
• Pulse Testing: Low disruption testing ideal for occupied buildings or multiple.
Selecting the right testing method depends on your project’s needs. Both methods reduce energy loss, enhance efficiency, and meet airtightness standards.
Spoke with Josh who not only reassured me but asked for a fee that I thought was fair. Thank you Josh. Use again? Definitely.
The team really know their stuff – super helpful and always had clear answers to any questions or compliance issues we ran into. Definitely our go-to for any future projects!
Quick and well priced water calculation service and received an appliance specification report alongside the certificate which was really useful for us and the building control officer, highly recommended!
Very knowledgeable about building regulations, and the industry. Always goes the extra mile to help out! 5*